A sample result of the first Selfware stage: business analysis. Using a construction company as an example, we show how the team’s accounts become a well-founded plan for automation and process redesign.
Glossary +
Business analysis
a study of current work, constraints and opportunities for change, used to choose what to implement next.
Target process
the part of the company’s work selected for study and change. Here, it is procuring work from contractors.
Lot
a separate package of construction work procured from a contractor.
Understand the work first, then choose the automation
Imagine you run a property development company and want to speed up procurement with AI. At first, the task looks simple: teach a system to read contractors’ proposals and prepare a comparison table. First, though, you need to understand whether employees compare the same quantities, who authorizes price changes, and when the company actually takes on commitments.
Our example is the fictional Kedrovy Ryad, a residential developer with its own general contractor. The company procures some work from outside organizations. The CEO sees cost overruns even though the company has tenders and a committee. We use this process to show how business analysis helps select useful automation and prepare a more substantial redesign of the work.
We compared the answers of nine modeled participants: managers, employees preparing procurement, and two external counterparties. We examined the same lot—plastering and floor screed in the second building of Tikhaya Versta—from several perspectives. This connected manual spreadsheet work with quantity changes, contract preparation and financial control.
For example, reading proposals automatically is useful, but comparing prices loses its meaning if a contractor priced the second version of the bill of quantities while the contract was signed against the third. The plan therefore starts with a shared version of procurement data, which then supports AI and approval rules.
Where intervention will help and which connections must be preserved.
Observations linked to participants’ answers
What supports the proposals and what still needs checking against documents.
A register of automation and redesign candidates
Which options to consider, what they require and what to measure.
An interactive map of the future process
How to divide work between AI, conventional software and people.
A prioritized transition plan
Which pilot to start with and under what conditions to expand implementation.
How to read the sample
The main story moves from the company and current process to opportunities, future work and the transition plan in chapters 02–07. Chapter 07 ends with the decisions the analysis leads to. The research plan, interview excerpts and limits of the findings are available separately in chapters 08–10.
The company and participants are fictional. The options for change are analytical proposals; there has been no implementation or measurement of results here.
02
Sample. The company is fictional
The company and the task
An introduction to the company and the scope of the study: which work we are changing and which conditions the future system must preserve.
Glossary +
Bill of quantities (ВОР)
a list of work items and quantities that a contractor uses to price a proposal.
Initial maximum price (НМЦ)
the lot’s initial maximum price: an estimated reference point for contractor selection.
Addendum
a document that changes the terms of an existing contract.
About the company
Kedrovy Ryad is a regional group that builds and sells comfort-class housing. It has four residential complexes and nine buildings under development, with 320–360 employees across the group. Its own general contractor builds the structural frame and performs some general construction work; the group procures the rest from contractors. According to the original company description, it tenders 60–90 work lots a year.
Procurement connects the construction team, project office, estimating department, tender team, management, legal, finance and the contractor. The company already uses Excel, email, messengers and 1С:Документооборот (a document management system). The future process therefore needs to bring these participants’ data and decisions together while keeping responsibility clear.
What exactly we are studying
We examine construction work procurement from the initial need and quantity calculations through to the contract, the first change and the review of the first work acceptance certificate. The running example is plastering and floor screed in the second building of Tikhaya Versta. Materials procurement and payment are considered only where interviews show the influence of timing and documents; the complete supply and payment process is outside this project.
The practical question for the first Selfware stage is: which actions can be assigned to a system, which rules need agreement first, and which future procurement arrangement is worth testing in a pilot?
What must be preserved through the changes
An engineer confirms the technical validity of quantities and specifications; the interviews gave no grounds to consider this responsibility replaceable.
Contractor selection, approval of commitments and document signing remain with authorized people. Authority must be confirmed before workflows are configured.
The estimating department and finance must be able to see which version of quantities and prices produced the contract and its changes.
The transition should not require abandoning all existing systems at once. We propose testing one part of the work first.
Full company description: history, projects, structure, systems and the official procurement procedure
This reference section is retained from the original training case. It is given context, rather than the result of investigating a real company.
What the company does
Kedrovy Ryad Group is a regional developer of comfort-class housing. A developer is a company that builds and sells housing. Comfort class means housing in the middle price segment. The group operates in a regional capital with about 600 thousand residents and two suburban districts. The city is not named.
The group is run by a management company owned by founder Stepan Kornilov (70 %) and his partner (30 %). A separate developer builds each residential complex, while the internal general contractor Vershinny Stvor builds the frame and performs some work; subcontractors do the rest. The group procures work from contractors under its 2023 Regulations: 60–90 lots a year.
Company history
2009.
Founder Stepan Ilyich Kornilov, formerly chief engineer of the local housebuilding plant, establishes a general contracting firm. A general contractor builds an entire project and is responsible for the result. The firm builds shells (buildings without interior finishes) for other developers.
2013.
The first in-house project is two five-story buildings in the suburbs. Apartments are sold under shared construction participation agreements: the buyer pays for an apartment before construction is complete.
2016–2019.
The group moves to cast-in-place concrete frame buildings of 9–17 stories. Their reinforced concrete frame is cast directly on site. A management company is established: sales, marketing, finance and the technical client function are separated from general contracting. The technical client function manages construction on behalf of the developer.
2019.
The group moves to project financing and escrow accounts. Project financing is a bank loan for a specific project. An escrow account holds buyers’ money until the building is complete. The main bank is a large federal bank; its agent (acting on the bank’s behalf) supervises construction and checks budgets.
2023.
The Regulations on Procurement of Work and Services—internal procurement rules—are adopted, and a tender committee is introduced. The trigger was a cost overrun of about 9 % on finishing at Veshny Otkos residential complex. The bank required a revision of the project budget and held up a tranche—the next loan disbursement—for a month.
2024.
Dmitry Arsenyev, a hired manager, is appointed CEO. The founder remains chair of the board above the CEO and the majority owner, meaning the owner of the larger stake.
Scale in 2026
People.The group has 320–360 people: 100–115 at the Kedrovy Ryad management company and 210–240 at Vershinny Stvor LLC (limited liability company), the group’s internal general contractor, including 150–170 workers.
Construction.There are 4 residential complexes, 9 buildings and 120–150 thousand m² of residential floor area under construction.
Volume and finances.Housing completions are 45–60 thousand m² a year. Group sales revenue is 5,5–7 billion rubles (Russian currency) a year, and construction cost is 3,8–4,8 billion rubles a year.
Procurement.Work procurement amounts to 60–90 lots a year, worth 2 to 120 million rubles each. A lot is a separate package of work put out for procurement. Materials procurement amounts to 150–250 requests a year. The tender threshold is 500 thousand rubles. A tender is a competitive selection of a contractor from several proposals.
Contractors.The register contains about 140 accredited organizations, meaning those allowed to participate in procurement; 35–50 are active at any one time.
Current projects
The four residential complexes have 9 buildings in total.
Residential complex
Buildings and stories
Status
Tikhaya Versta
3 buildings, 17 stories
Building 1 completed; buildings 2 and 3 at the finishing and internal utilities stage
Zarechnaya Okolitsa
2 buildings, 12 stories
Cast-in-place concrete frame
Veshny Otkos, phase 3
2 buildings
Groundworks (base and foundation preparation) and frame
Yasny Prichal
2 buildings
Construction permit received in July 2026; preparation for frame tenders is under way
Legal and ownership structure
UK Kedrovy Ryad LLC — the group’s management company. Stepan Kornilov owns 70 % and his long-standing partner 30 %; the partner is not involved in operations. The management company houses sales, marketing, finance, legal, the technical client function, estimating and contracts, supply and tenders.
Specialized developers (СЗ). A separate “СЗ …” company is established for each residential complex, as required by Federal Law 214-ФЗ on shared construction. These developers sign contracts with contractors and receive bank loans. They have almost no employees of their own: the management company handles everything under a management agreement.
Vershinny Stvor LLC — the internal general contractor. It builds the cast-in-place concrete frame and performs some general construction work itself. Finishing, facades, utilities, lifts and landscaping go to subcontractors, meaning other contractors it hires. Some contracts are signed directly by the specialized developer and others by Vershinny Stvor; this arrangement developed over time.
Reporting lines
Above the CEO is the board—the group’s governing body—chaired by founder Stepan Kornilov. Management company CEO Dmitry Arsenyev reports to the board. Reporting to him are:
Department
Functions and leadership
Commercial team
Sales, marketing, mortgage center
Finance team (led by the CFO)
Accounting (1С:Accounting, accounting software); treasury and bank relations; budgeting and control team—Elena Stroganova
Legal department
Lawyers
Technical director—Viktor Gordeyev
Technical client team (project managers, including Roman Valiullin); project office (accepts working documentation from external designers; the chief project engineer works under contract); estimating and contracts department—Galina Usoltseva (5 estimators, including Kirill Demchenko); production and technical department and as-built documentation
Supply and tenders department
Materials supply team; work tender team—Olesya Miroshnichenko (2 specialists)
Vershinny Stvor LLC
Site managers, site supervisors, foremen and crews; the director reports to the technical director on production
Working documentation (РД) means the drawings and documents used to build. As-built documentation records what was actually built. An estimator is a specialist who calculates the cost of work.
Tender committee
Under the Regulations, the tender committee includes:
the CEO as chair;
the technical director;
the CFO or a representative of the budgeting and control team;
the head of estimating and contracts;
the head of the tender team as committee secretary, without a vote.
Meetings are held on Thursdays. The quorum—the number of committee members required for a meeting to make decisions—is three voting members.
Systems used to manage data
System
What it stores
Maintained by
ГРАНД-Смета (estimating software), a network license for 3 workstations
Local estimates using the base-index method (regional ТЕР-2001 rates with conversion indices to current prices); less often, resource-based estimates in the bank’s format
Estimating department
Excel: contract price database
About 1 800 rows: rates from contracts signed in the last 3 years
Kirill Demchenko, unofficially
Excel: bills of quantities (ВОР)
Quantities calculated from working documentation (PDF and DWG from the designer)
Estimators
Excel: tender comparison sheet
Comparison of bidders’ proposals against bill items
Olesya Miroshnichenko
Corporate email
Sending requests for commercial proposals, receiving proposals and correspondence
Everyone
WhatsApp and Telegram
Site work chats, the KR Tenders chat and private correspondence with contractors
Everyone, especially construction
Shared folder on the file server
Commercial proposals, bills of quantities and minutes
Tender team, estimators
1С:Документооборот
Contract records, approval sheets and internal memos
Legal, contracts team
1С:Accounting
Contracts, КС-2 and КС-3 certificates, payments
Accounting
Excel: project budget (income and expenditure and cash flow budgets for each specialized developer)
Budget lines, contingency reserve and actuals from work certificates
Elena Stroganova
Bank template (Excel)
Project budget and execution report for the bank and its agent
Elena Stroganova
Abbreviations and terms:
КП—a commercial proposal, meaning the contractor’s price;
ВОР—a list of work items and quantities;
КС-2—a work acceptance certificate;
КС-3—a certificate of the cost of completed work;
БДР—income and expenditure budget;
БДДС—cash flow budget;
contingency—a reserve of money for unforeseen expenditure.
Where data is transferred manually
Data is re-entered manually from one system into another at six points:
1Quantities from working documentation (PDF) are transferred into the bill of quantities (Excel).
2The bill is transferred into estimating software to calculate the lot’s initial maximum price.
3Bidders’ proposals (PDF, Excel in their own formats, photographs of price lists) are transferred into the tender comparison sheet.
4The winning prices are transferred into the contract appendix (Word or Excel) and 1С:Документооборот.
5The contract and КС-2 are transferred into 1С:Accounting.
6Contract and work certificate amounts are transferred into the Excel project budget, then into the bank’s template.
Official work procurement procedure
This is how the process “Estimate preparation, collection and comparison of contractors’ proposals” is described in the Procurement Regulations (2023 edition) and presented by management.
1
Need.
45–60 days before work starts, the project manager uses the production schedule to prepare an internal “Request to procure work” memo in 1С:Документооборот. It gives the type of work, building, deadlines and a link to the project budget line.
2
Documentation.
The project office confirms that the section’s working documentation has been “issued for construction” (stamped accordingly) and passes it to estimating.
3
Bill of quantities and estimate.
The estimator uses the working documentation to prepare a bill of quantities and local estimate using the base-index method. The head of estimating checks it. The estimate total, adjusted downward by a market coefficient, becomes the lot’s initial maximum price. This is allotted 5 working days.
4
Approval.
The technical director approves the bill of quantities and technical specification—the description of work requirements. After approval, the bill does not change until the contract is signed.
5
Request for proposals.
The tender team sends a proposal request to at least three contractors from the accredited register. Bidders fill in a form based on the bill of quantities: unit rates, meaning prices per unit of work, for every item. The submission deadline is 7 working days.
6
Storage.
All incoming proposals are registered and attached to the procurement record in 1С:Документооборот.
7
Comparison.
The tender team consolidates proposals into a tender comparison sheet; estimating checks rates and arithmetic. There is one round of rebidding—another negotiation on price.
8
Tender committee.
The committee selects the winner. Approval of deviations of the winning price from the initial maximum price is described as follows. If the winning price is no more than 5 % above it, the committee decides. Above 5 %, CEO approval is mandatory, with justification from the budgeting team. Above 10 %, or if the budget line overrun is not covered by contingency, the project budget is revised with approval from the founder and the bank financing the project.
9
Contract.
A lawyer prepares the contract on the standard form; estimating and contracts prepares appendices (price calculation and bill of quantities). The contract is approved in 1С:Документооборот and signed. Work does not start before the contract is signed.
10
Execution.
The contractor submits КС-2 and КС-3 monthly. The production and technical department and site supervisor check quantities, estimating checks contractual rates, and budgeting checks compliance with the budget. Additional work is documented through an addendum under the same deviation approval procedure as the main contract.
The standard time from request to signed contract is 15–20 working days. Management considers this generally met: “there are delays on the contractors’ side.”
03
Sample. The company is fictional
How procurement works today
Follow one procurement through the participants’ accounts. Open any step and its source in the interactive map; dashed lines mark places where accounts disagree or a connection needs checking.
Glossary +
Current process
a reconstruction of work from interviews. It is not an event log verified against the documents of a specific procurement.
КС-2
a work acceptance certificate; in this part of the process, it is used to check quantities, rates and budget.
Bill version
a specific set of work items and quantities that the proposal and contract appendix should reference.
Working documentation (РД)
drawings and related documents used to determine the scope and quantities of construction work.
Procurement passes through files, people and several workflows
The construction team reports a need, the estimator prepares the bill and price, the tender team collects proposals, and the committee selects a contractor. The estimator then transfers the winning prices into an appendix, while a lawyer manages the contract. Procurement work does not end there: changes are documented in addenda, and finance checks the budget when reviewing the work acceptance certificate.
The interviews show that this sequence can split into parallel branches. The bill changes while proposals are being prepared. Sometimes the contractor starts on site before the contract. An addendum follows its own workflow, which finance learns about later.
The links between versions of quantities, proposals and the contract need to be preserved.
Selection and price
Finance gives an estimated price of 38,4 million rubles (Russian currency) and 39,9 million after bidding. The budget line later reached 42,5 million. Interview 06 · answer 3Interview 06 · answer 4
Controlling the winning price alone is not enough to track subsequent commitments.
A change in the commitment needs to be visible before it becomes a work acceptance certificate.
Start of work
The project manager gives 22 April as the start of work and 13 May as the contract date, which he remembers only approximately. Interview 05 · answer 6
An explicit workflow for urgent decisions and a check on document readiness are needed.
What the map does not establish
It connects accounts of the work. We do not claim to have traced every operation through files and system logs. For example, the CEO tentatively names the technical director as the signatory, while the technical director names the CEO. Before automating signatures, current authority must be checked rather than choosing one of the answers.
The interviews revealed three connected problems: data versions differ, financial decisions follow separate paths, and paperwork lags behind the work. These determine where redesign needs to begin.
Glossary +
Observation
a finding drawn from specific participants’ answers, with their sources identified.
Hypothesis
an explanation or improvement option that still needs to be tested.
Commitment
the company’s promise to pay for agreed work; how it is recorded and who has authority must be defined in the rules.
КС-2
a work acceptance certificate used to check quantities, prices and compliance with the budget.
1. Proposals are compared, but the basis of comparison changes
Contractors send Excel and PDF files in their own formats. The tender team transfers them into a table; after selection, the estimator transfers the prices into the contract appendix. Meanwhile, the bill may be reissued. In the lot examined, the contractor explicitly describes pricing the second version and receiving a contract based on the third.
They all use their own formats, some in Excel, some in PDF, so I put everything into a comparison table myself.
I priced the second version of the bill, but the contract had already been signed against the third. Nobody told me what changed between them; I compared them myself.
The implication for the project: transferring figures quickly does not by itself make proposals comparable. A shared lot version, the source of each price and explicit change handling are needed. The accuracy of construction quantities must remain subject to engineering review.
2. Tender control does not cover the full path of price changes
The CEO believes significant addenda go through him. The head of budgeting describes a different workflow: up to 3 million through the technical director and a lawyer, without finance. According to her account, an agreement for 2,6 million became visible during the КС-2 review, after it had been signed.
The workflow for addenda up to 3 million in 1С goes through the technical director and a lawyer; finance is not part of it.
This is grounds to check the approval workflow and shared tracking of commitments. We cannot yet say that every such document breaks a rule: the text of the rules, their applicability and authority have not been checked against the documents of a specific agreement.
3. Construction and paperwork move at different speeds
The project manager describes the contractor starting under a letter of guarantee before the contract; the technical director confirms the practice itself. Finance returns requests when there is no contract yet. The contractor says delayed payment is factored into the price—this is his estimate, rather than proven savings from a future implementation.
Sometimes the crew is already on site while the contract is still being circulated for signatures.
The future process needs to define when a commitment is made, which urgent exceptions are permitted, and who is responsible for documenting them. Otherwise, a faster spreadsheet will feed the same delayed workflow.
How this changes the automation task
The first useful area is proposal processing. Its design, however, needs to account for the bill version and data transfer into the contract from the start. The next changes are shared tracking of contracts and addenda, timely budget checks, and clear authorization to start work. This moves from automating individual files to managing the state of the entire procurement.
05
Sample. The company is fictional
Automation and redesign candidates
We turn the observations into possible solutions: where AI can help, where conventional checks are needed, and which changes to the way work is organized must come first.
Glossary +
Pilot
a limited test of a solution on an agreed set of procurements before expanding implementation.
Feasibility check
a check of whether the available data and technology quality are sufficient for the chosen task.
Baseline measurement
a measurement of today’s work used for comparison with the pilot result.
Reference set
example documents with a verified correct interpretation, against which the system’s result is compared.
Five opportunities, one sequence
We recommend testing a proposal comparison assistant together with minimal version tracking. The same data can then be linked to the contract and its changes. Budget and contract workflows are connected after the rules are agreed; engineering review requires its own document set and quality assessment.
The priorities below are an analytical recommendation. They take into account interview evidence, dependencies and the extent of organizational decisions required. They are not a customer-approved implementation plan or a commercial estimate.
First pilot · analytical proposal
Collect proposals into a verifiable comparison table
What changes
AI extracts items and terms from proposals, links to the source fragments and suggests matches to the current bill’s lines. Software recalculates totals, units and arithmetic. A specialist confirms the matching and handles exceptions.
Expected benefit
Reduce repeated data entry and the time needed to prepare a verified comparison.
Conditions and unknowns
Examples of actual document formats, an agreed bill version and a reference set with correct interpretation verified by an employee are needed. Recognition quality on these files has not yet been measured.
How to test
A specialist’s active time per lot; share of corrected lines; number of missed material terms; all proposals must be compared against the same bill version.
Foundation for the other changes · analytical proposal
Manage procurement as one record with versions and changes
What changes
Instead of passing on another file, create a procurement record: the current quantity version, original proposals, accepted matches and selected prices. Any quantity change creates a new version and a list of affected proposals. The contract appendix is prepared from the accepted dataset.
Expected benefit
Reduce repeated transfers and make changes visible before comparison and signing.
Conditions and unknowns
A version owner must be appointed, with rules on who may change it and when new prices need to be requested. Available data exchange methods with existing systems need checking.
How to test
Share of proposals with a specified version; number of unnoticed version discrepancies; manual corrections between the table and appendix; completeness of change history.
Next stage after the rules are agreed · analytical proposal
Check the budget whenever a commitment changes
What changes
The contract and every addendum are linked to one procurement and budget line. Software calculates the cumulative amount and starts the workflow under approved rules. Finance receives the change before it is accepted. AI can explain a deviation with document references; authorized people make the decision.
Expected benefit
See the impact of additional work earlier and close the gap between contract approval and its changes.
Conditions and unknowns
First agree the threshold calculation basis, finance participation, contingency use, register access and authority. The 3 million figure from a participant’s account must not automatically become a rule in the future system.
How to test
Share of changes checked against budget before acceptance; time from a proposed change to a decision; number of exceptions without an agreed basis.
Next stage together with construction and legal · analytical proposal
Synchronize work authorization with contract readiness
What changes
Procurement gains explicit states: contractor selected, terms agreed, contract ready, work authorization issued. Urgent situations have a separate workflow with recorded terms, a responsible person and a documentation deadline. AI helps prepare the document set and flag missing items; a person issues authorization under approved authority.
Expected benefit
Make the acceptance of commitments and unfinished documents visible to construction, legal and finance.
Conditions and unknowns
Signatory authority needs confirming, along with a decision on whether urgent exceptions are allowed and under what conditions. The full payment process is not being designed here.
How to test
Share of work starts with a documented basis; time to complete exception paperwork; certificates and requests returned because the contractual basis is missing.
Support engineering review and the first certificate check
What changes
AI flags ambiguous or missing items and links certificate lines to the contract and approved changes. Software checks arithmetic and rates. An engineer confirms quantities against drawings and actual work; finance confirms compliance with the budget.
Expected benefit
Help specialists notice discrepancies earlier and focus their review on substantive questions.
Conditions and unknowns
Drawings and documents of acceptable quality, reference examples correctly interpreted by an engineer, and independent verification are needed. The contractor’s estimate of a 12–18% shortfall is not a proven defect and gives no grounds to promise that level of savings.
How to test
Misses and false flags on examples verified by an engineer; review time; engineer corrections. Interviews alone cannot establish the quality of this solution.
The head of tenders initially gave 3–4 hours, then corrected the estimate to 2–4 hours per lot and added that the work repeats whenever the bill is reissued. She also reported 6–8 work tenders a month for a two-person team. The calculation uses her latest correction.
And the time I spend is not three to four hours, but two to four per lot, plus every time the bill is reissued.
6–8 lots × 2–4 hours for one consolidation of proposals. This is the team’s baseline workload range, not a promise to free up all these hours. Repeated recalculations are excluded: their frequency is unknown.
To assess the effect, we need to measure manual work time on selected lots, time spent checking the AI result, and the effort of corrections. The financial effect is calculated from the confirmed difference in time and labor cost, less operation and support costs. Without files and measurements, payback has not been calculated.
06
Sample. The company is fictional
How procurement could work after redesign
The proposed model brings documents and decisions together around one procurement. AI helps interpret information, software performs approved checks, and people remain responsible for engineering and commercial decisions.
Glossary +
Target model
a proposed future way of organizing work; it must be agreed and tested before implementation.
Procurement state
a status participants understand: which data is ready, which decisions have been made and what is still needed.
Exception
a situation that does not follow the normal workflow and requires a separate decision.
One procurement becomes a shared place to work
The project manager creates a procurement record with the need, deadline and budget line. The estimating department confirms the initial quantities and version. Proposals enter the shared record, where AI prepares the interpretation, software checks the figures, and a specialist confirms the matching. If quantities change, the system shows which prices need recalculation and returns affected proposals for review.
After contractor selection, the accepted items and terms are used to prepare the contract appendix. The contract and its changes update the shared view of commitments. Before work starts, an approved basis for starting is checked. At the first work acceptance certificate, participants see the same quantity versions, prices and approved changes.
Proposed model · not yet implemented
How responsibility is divided
AI assists
Software checks and stores
People decide
Extracts items, terms and qualifications from documents in different formats.
Stores the source document, version, confirmed values and correction history.
A specialist confirms that proposals have been matched correctly.
Suggests line matches and explains discrepancies with reference to the source.
Recalculates totals, units and approved thresholds; detects version mismatches.
An engineer approves quantities and technical suitability; management selects the contractor.
Prepares draft appendices and lists of missing information.
Routes the contract and changes through the approved workflow; records the decision and deadline.
Authorized employees approve commitments, exceptions and document signing.
Two return paths the process needs to work
If AI is uncertain or documents cannot be matched, the work returns to a specialist for clarification. Unverified figures do not become the basis for selection.
If quantities or terms change, a new version is created and the impact on proposals, the contract and budget is checked. Previous approval is not silently carried over to new terms.
How this prepares the process for AI
Inputs, versions, authority, states and exception rules become explicit. AI receives a bounded task and produces a verifiable result within the process. A person can see the source and reason behind the system’s suggestion, correct the data, return the work and confirm the decision. This arrangement allows automation to expand as quality is verified, while retaining control.
07
Sample. The company is fictional
Transition plan and decision
We conclude the analysis by choosing the next step: what to test first, which decisions the company needs to make, and what would justify expanding implementation.
Glossary +
Exit criterion
a condition that must be met before moving to the next step.
Implementation readiness
having data, agreed rules, responsible people and verification criteria; interviews alone do not guarantee it.
Integrator
a team that configures systems and implements the chosen changes in the company’s work.
The recommended first step
Start with a pilot for preparing a comparison table for one group of construction work procurements. Include the bill version, links to source proposals and manual confirmation of the result in its scope from the start. This will test the usefulness of AI in document work and prepare a basis for transferring accepted prices into the contract.
We do not yet recommend automatically taking on financial commitments or authorizing work to start: interviews revealed unclear workflows and authority. The company must first approve the rules, after which the system’s execution of them can be tested.
The transition sequence
Step
Work and responsible roles
Exit criterion
1. Prepare the pilot
The head of tenders and estimating department select representative lots and documents, reconcile versions and mark up the correct comparison. The customer appoints an owner of the result.
There is a verifiable example set, a baseline time measurement and agreed quality criteria; access and the permissibility of data processing are confirmed.
2. Test the proposal assistant
The implementation team configures interpretation and checks; a tender specialist confirms every table, and an engineer resolves disputed matches.
Agreed quality measures are met on the selected examples; active time, including review and corrections, is measured. Unacceptable error conditions are defined in advance.
3. Connect data to the contract
The estimating department and legal agree how accepted items are transferred into the appendix; the implementation team checks data exchange with existing systems.
The chain “version → proposal → comparison → appendix” is traceable; repeated data transfer and change handling have been checked.
4. Connect commitments and urgent exceptions
Finance, the technical team, legal and management approve authority and rules for changes to the budget, contract and start of work.
Normal and urgent workflows produce the expected decisions on test cases; the basis, responsible person and cumulative value of changes are visible.
5. Expand based on results
The customer compares the pilot’s benefits and costs; engineering assistance and certificate checking undergo separate assessment.
The effect is confirmed and support arrangements are defined; scaling does not reduce quality or lose control of exceptions.
Brief for the first pilot
The pilot runs from received proposals against one approved bill version to a comparison table checked by an employee. Contractor approval, contract signing, taking on commitments and payment are outside the pilot’s automatic actions.
Input
Procurement identifier, approved bill version, original proposal files, contractor information and a list of fields to compare. The document set is chosen to include normal cases, changes and ambiguous items.
Output
A table of matched items, prices and terms with links to the source fragments; checked arithmetic; a list of missing or disputed data; a correction log and specialist confirmation.
Verification approach
The pilot prepares a draft alongside the existing work. An employee compares it with the reference interpretation, corrects and confirms it. Integrations and automatic use of the result expand only after assessment.
Proposed acceptance criteria
All incoming proposals are included. Every value used is traceable to its source. Version mismatches and missing material terms are explicitly flagged. An unnoticed substitution of a price, quantity or unit counts as an unacceptable error on the reference set. Table confirmation remains with a specialist.
Decision on the result
Compare the employee’s active time, errors, correction effort and full costs. Continue implementation if agreed quality requirements are met and usefulness is confirmed; otherwise revisit the task set, data or solution approach.
This is a proposed brief prepared through business analysis. Before the pilot starts, the customer approves the scope, reference documents and criteria.
What needs deciding before the start
Which lots and documents enter the pilot, and who accepts its result on the company’s behalf.
Who owns the quantity version, who approves changes, and when contractors need to reprice their proposals.
Which comparison errors are unacceptable and which can be corrected manually during the pilot.
Who may accept and sign commitments; how addenda, contingency and urgent starts are approved.
How quality, employee time and the full cost of the solution will be measured.
What we found—and what can happen next
The interviews establish manual procurement work with proposals in different formats and repeated price transfer. A useful change, however, extends beyond one table: a shared lot version, an agreed set of terms and timely change control connect preparation, selection, the contract and the first work acceptance certificate.
The result of this stage is a sourced description of today’s work, a register of five opportunities, a proposed future map and a transition sequence. These provide a basis for discussing pilot scope and an implementation estimate with Selfware or another integrator. A detailed technical design, implementation cost and proven economic effect follow verification of documents, rules and the pilot.
The decision recommended by the analysis
Test an AI assistant for proposal comparison against a shared procurement version. In parallel, agree rules for versions, commitments and authority so the next stage redesigns the entire process rather than speeding up disconnected file exchanges.
The main story ends here. Next are reference materials: the research plan, sources and limits of the findings.
08
Sample. The company is fictional
How the research was conducted
The original interview plan and the new analytical question are kept separate: the conversations covered procurement and its problems; the AI use cases were developed while preparing this report.
Glossary +
Modeled interview
a conversation through the product with a model playing a fictional company participant.
Source
a participant’s answer or the given description of the training company; the analyst’s findings are marked separately.
The original interview task
In the original interview, the CEO did not set a task of implementing AI. In this demonstration document, we treat his problem as a basis for looking for automation opportunities. The CEO wanted to understand why finishing work runs over budget and why contracts are signed later than the specified deadline. The study covered work procurement from the initial need through to the signed contract, first addendum and review of the first work acceptance certificate for quantities, prices and budget.
Nine roles took part in the conversations: CEO, head of estimating, estimator, head of tenders, project manager, budgeting, technical director, contractor and materials supplier. The contractor provides an outside view of comparability and the contract; the supplier provides only additional context on how long materials prices remain valid.
What the conversations examined
How procurement began and what was passed between participants.
Which version was used to calculate quantities and proposals, and how changes were handled.
Who selected the contractor, approved the money and prepared the contract.
How work started, addenda arose and the first certificate was reviewed.
Which work was done manually and how employees themselves estimated its volume.
How this sample was prepared
The basis is the saved answers from nine interviews conducted through the product on the test stand on 12 October 2026. For this report version, we compared the answers again and prepared proposals for change. No repeat interviews were conducted: the existing answers were sufficient to develop options and identify questions for documentary verification.
The analysis used participants’ full answers and corrections, rather than only automatic summaries: in several conversations, the summary cut off and failed to retain important information. We did not use hidden character behavior descriptions or the initial dialogues where a single model played both sides. This is a sample of what a business analysis deliverable contains, rather than proof of fully automatic report preparation.
What to clarify before a real implementation
The original proposals, bill versions, contract and change for the selected lot are needed, along with the approval workflow and authority, actual time expenditure and available system data exchange methods. Where documents and accounts disagree, targeted follow-up interviews are conducted. Generating another opinion from a fictional participant cannot resolve these questions.
09
Sample. The company is fictional
Quotes and sources
Here you can check the basis of each material observation. Excerpts identify the participant’s role, interview and answer number; expand them to read the full answer from which the quote was taken.
Glossary +
Answer
the participant’s answer number in the conversation; the interviewer’s opening greeting is excluded from answer numbering.
Quote context
the full answer, allowing you to check exactly what the participant was discussing and which qualifications they made.
ВОР
bill of quantities: a list of work items and quantities.
РД
working documentation, including drawings.
КС-2
a work acceptance certificate.
МОП
common areas, such as corridors and stair landings.
НМЦ
the lot’s initial maximum price: an estimated reference point for procurement.
СЗ
a specialized developer: the group company in whose name the relevant project is documented.
Nine perspectives
Interview
Role
Contribution to the study
01
CEO
The customer’s problem and expectations of approvals.
02
Head of estimating and contracts
Official preparation and verification of the estimate.
03
Cost engineer
Versions, source drawings and price transfer.
04
Head of the tender team
Proposal formats, comparison volume and time.
05
Project manager
Construction needs and the contractor starting before the contract.
06
Head of budgeting and control
Budget, changes and when commitments become visible to control.
07
Technical director
Technical approval and the practice of starting work.
08
Finishing contractor
Versions from the contractor’s side, pricing and working terms.
09
Materials supplier
Adjacent materials procurement: price validity. Outside the main pilot.
Interview 03 · answer 4 · 12 October 2026
Cost engineer
There were three on this lot.
Full participant answer
Well, that is her side of things; I am not really involved there. She sends it to contractors, collects proposals, makes a comparison table, then it goes to the committee. I only know what reaches me. But then the fun starts for me: changes to the working documentation come in, or Roman writes “add the reveals, remove what we will do ourselves,” and I redo it and send Olesya a new version. The usual thing, another reissue. There were three on this lot.
Interview 08 · answer 7 · 12 October 2026
Finishing contractor
I priced the second version of the bill, but the contract had already been signed against the third. Nobody told me what changed between them; I compared them myself.
Full participant answer
They send their standard form; I do not change much, at most I argue about payment terms. The contract says thirty days after КС-2; in practice it takes forty-five to sixty. And another thing: I priced the second version of the bill, but the contract had already been signed against the third. Nobody told me what changed between them; I compared them myself.
Interview 04 · answer 3 · 12 October 2026
Head of the tender team
They all use their own formats, some in Excel, some in PDF, so I put everything into a comparison table myself.
Full participant answer
In practice, proposals come to my email; the submission deadline is seven working days. They all use their own formats, some in Excel, some in PDF, so I put everything into a comparison table myself. That takes three to four hours per lot. Then one round of rebidding, and I take it to the committee.
Interview 04 · answer 10 · 12 October 2026
Head of the tender team
And the time I spend is not three to four hours, but two to four per lot, plus every time the bill is reissued.
Full participant answer
Broadly correct, but the ending is missing: after rebidding comes the committee, then the minutes and the contract through legal. And the time I spend is not three to four hours, but two to four per lot, plus every time the bill is reissued.
Interview 04 · answer 7 · 12 October 2026
Head of the tender team
Six to eight work tenders a month. There are two of us in the team, me and a specialist.
Full participant answer
Six to eight work tenders a month. There are two of us in the team, me and a specialist.
Interview 03 · answer 6 · 12 October 2026
Cost engineer
not compiling an estimate for the winner, but transferring their prices into our contract appendix, against the same items as in the bill.
Full participant answer
A correction: I am not compiling an estimate for the winner, but transferring their prices into our contract appendix, against the same items as in the bill. An Excel file; it is not uploaded into a shared system, I hand it to legal and that is it. We have a system for accounting, 1С (accounting software), but this is not in it.
Interview 01 · answer 5 · 12 October 2026
CEO
Under the Regulations, an addendum is treated as a contract, so anything above 5% comes to me, just like the tender itself.
Full participant answer
Under the Regulations, an addendum is treated as a contract, so anything above 5% comes to me, just like the tender itself. Our system is strict; I tightened it myself after the bank incident in 2023: Veshny Otkos had a cost overrun of about nine percent, and the bank held up the tranche for a month. Things have been in order since then.
Interview 06 · answer 6 · 12 October 2026
Head of budgeting and control
The workflow for addenda up to 3 million in 1С goes through the technical director and a lawyer; finance is not part of it.
Full participant answer
I can only describe my side, because I did not see that approval myself. In August, a КС-2 from Rovny Ugol arrived for quantities beyond the contract, and that is how I learned that an addendum for 2,6 million had been signed in July for “additional quantities for reveals and common areas.” The workflow for addenda up to 3 million in 1С goes through the technical director and a lawyer; finance is not part of it. I consider that a gap in the workflow. So it only appeared in my budget after the fact, at the КС-2 stage.
Interview 01 · answer 6 · 12 October 2026
CEO
Over the past year, not a single one was brought to me for approval, and I assumed that meant there had been no large ones.
Full participant answer
That particular addendum was not brought to me, as far as I remember. Over the past year, not a single one was brought to me for approval, and I assumed that meant there had been no large ones. I learned of the overrun from Stroganova’s monthly summary, from the total. When was the last time I was brought an addendum above five percent? Honestly, I cannot remember offhand.
Interview 05 · answer 6 · 12 October 2026
Project manager
they started on 22 April; I gave them a letter of guarantee on our specialized developer’s letterhead. the contract was signed later, in May, on the 13th, I think.
Full participant answer
well, why should they wait? there is a deadline. they started on 22 April; I gave them a letter of guarantee on our specialized developer’s letterhead. the contract was signed later, in May, on the 13th, I think. you are not asking for an audit, are you?
Interview 07 · answer 6 · 12 October 2026
Technical director
Sometimes the crew is already on site while the contract is still being circulated for signatures.
Full participant answer
The point is that construction cannot stop. Paperwork takes two to three weeks, and the schedule will not wait. Sometimes the crew is already on site while the contract is still being circulated for signatures. Roman tells me, I know about it. You cannot stop a site; you are not going to send people home.
Interview 06 · answer 9 · 12 October 2026
Head of budgeting and control
I return those requests with a note saying “no contract yet.”
Full participant answer
It happens; I see it in payment requests: the contractor submits a request, but there is no contract yet, only a letter of guarantee. I return those requests with a note saying “no contract yet.” Contractors then wait a month and a half to two months for their money, and of course they are unhappy. I do not have an exact figure for how often it happens.
Interview 08 · answer 9 · 12 October 2026
Finishing contractor
I factor that into the price, three to four percent on top—it is credit, after all.
Full participant answer
It has happened, including on building 2. I started on the twenty-second of April under Roman’s letter of guarantee, but the contract was not signed until the thirteenth of May. And my first КС-2 was returned; they said the rates did not match the contract. What contract, when there was not one yet? The money for April–May arrived a month and a half to two months later. I factor that into the price, three to four percent on top—it is credit, after all.
Interview 06 · answer 3 · 12 October 2026
Head of budgeting and control
the line now totals 42,5 million against an estimate of 38,4.
Full participant answer
The estimated lot price was 38,4 million; it fitted the budget line. Do you mean the discrepancy at reconciliation or the final one for the lot? If the final one, then yes: the line now totals 42,5 million against an estimate of 38,4. I covered it from the contingency reserve.
Interview 06 · answer 4 · 12 October 2026
Head of budgeting and control
after rebidding, the winner came in at 39,9 million, which is less than 5 % above the estimate.
Full participant answer
The lot then goes to the tender team; Olesya Miroshnichenko sends requests to contractors from the register, at least three. Proposals come in, they are consolidated into a tender sheet, and the estimating department checks the rates. Then the tender committee meets on Thursdays. As I understand it, all proposals are in the procurement record in 1С:Документооборот. The committee selects the winner; I represent finance there. This lot had Rovny Ugol, Betonny Rubezh and Fasadnik; after rebidding, the winner came in at 39,9 million, which is less than 5 % above the estimate. So it did not go to the CEO.
Interview 06 · answer 6 · 12 October 2026
Head of budgeting and control
In August, a КС-2 from Rovny Ugol arrived for quantities beyond the contract, and that is how I learned that an addendum for 2,6 million had been signed in July
Full participant answer
I can only describe my side, because I did not see that approval myself. In August, a КС-2 from Rovny Ugol arrived for quantities beyond the contract, and that is how I learned that an addendum for 2,6 million had been signed in July for “additional quantities for reveals and common areas.” The workflow for addenda up to 3 million in 1С goes through the technical director and a lawyer; finance is not part of it. I consider that a gap in the workflow. So it only appeared in my budget after the fact, at the КС-2 stage.
Interview 08 · answer 12 · 12 October 2026
Finishing contractor
I did not say “three times less.” The plastering shortfall is twelve to eighteen percent.
Full participant answer
Go ahead. Just let me correct that so it does not go into the notes wrong: I did not say “three times less.” The plastering shortfall is twelve to eighteen percent. I told Viktor Pavlovich about it about three times on different lots, and the answer was always the same: make it up through addenda. So I stopped.
Interview 01 · answer 8 · 12 October 2026
CEO
The technical director, Viktor Pavlovich, signs at these amounts, I think.
Full participant answer
A lawyer prepares it on the standard form; the estimating and contracts department prepares the appendices, price calculation and bill of quantities. Approval goes through 1С:Документооборот, then signing. The technical director, Viktor Pavlovich, signs at these amounts, I think. This is operational detail; I am concerned with the substance here, not the procedure. Let us stick to the figures: I need to understand where the margin is leaking.
Interview 07 · answer 5 · 12 October 2026
Technical director
The CEO signs.
Full participant answer
Rovny Ugol won, Artur Saakyan; we have worked with him for about five years, he is reliable. Legal prepares the contract on the standard form, and estimating and contracts prepares the appendices. It goes through approval in document management; I sign it off there too. The CEO signs. Legal wrote the Regulations; everything is itemized there, but life works differently.
Interview 02 · answer 6 · 12 October 2026
Head of estimating and contracts
Under the Regulations, the bill does not change after approval.
Full participant answer
Under the Regulations, the bill does not change after approval. If the design changes, that is a new lot or an addendum; it is all clear. For plastering in building 2, if I am not mistaken, there was an architectural design change, one, I think. We accounted for it, as far as I remember.
Interview 03 · answer 8 · 12 October 2026
Cost engineer
drawings arrive unfinished, sometimes without an “issued for construction” stamp or marked “rev. 1,” but we have to calculate right away.
Full participant answer
I try to automate it myself, writing Excel macros to speed up recalculation when the working documentation changes. But that is not the root of it: drawings arrive unfinished, sometimes without an “issued for construction” stamp or marked “rev. 1,” but we have to calculate right away. Until the working documentation settles down, reissues are inevitable. That is how things have always worked here.
Interview 09 · answer 3 · 12 October 2026
Materials supplier
My rebar price is valid for three working days
Full participant answer
Just recently, in September, there was a request for rebar for building 2 of Tikhaya Versta. It came by email from their supply team, an official request with item descriptions and quantities. I reply with a commercial proposal on letterhead. My rebar price is valid for three working days, because metal prices fluctuate; last week they went up six percent.
Interview 09 · answer 4 · 12 October 2026
Materials supplier
Their selection takes eight to fifteen working days
Full participant answer
Of course they missed it :) Their selection takes eight to fifteen working days; it is bureaucracy, some customers decide in two days. By the time they decide, the price has changed. Then they either rebid or buy at the new price. For metal the difference is about three to seven percent. That time they took the new price and grumbled.
Interview 08 · answer 5 · 12 October 2026
Finishing contractor
I do not put my actual quantities in the letter.
Full participant answer
Look, I price against the bill, as they ask, so the proposal is comparable with the others. I do not put my actual quantities in the letter. I set the price a little above the estimate if I have a rough idea where it is. The missing amount is then made up through an addendum; everyone does it, it is normal market practice.
Interview 06 · answer 7 · 12 October 2026
Head of budgeting and control
not a “surprise at payment,” but at acceptance of the КС-2 in my part of the process—when we check compliance with the budget.
Full participant answer
Formally, no, I did not submit a separate request to change the workflow. I thought it was more a matter of discipline: we have regulations, they need to be followed, and construction should not sign addenda around them. But yes, I see the gap in the workflow. And one more clarification: not a “surprise at payment,” but at acceptance of the КС-2 in my part of the process—when we check compliance with the budget.
Interview 03 · answer 3 · 12 October 2026
Cost engineer
One bill of quantities takes me a day and a half to two days; I have 3-5 lots a month
Full participant answer
I prepare the bill of quantities in Excel and send it to Olesya Miroshnichenko in the tender team, together with the price. Usually as a file by email or messenger, whatever works. One bill of quantities takes me a day and a half to two days; I have 3-5 lots a month, so there is no breather :)
Interview 06 · answer 10 · 12 October 2026
Head of budgeting and control
records in 1С, the committee minutes, КС-2, my Excel budgets and the bank’s template.
Full participant answer
That is hard for me to answer, because I work with what is documented: records in 1С, the committee minutes, КС-2, my Excel budgets and the bank’s template. I do not see what construction decides in calls and chats. I only know the sites have their own work chats. I want everything in the workflow; otherwise there is nothing to substantiate the budget line to the bank’s agent later.
Interview 01 · answer 1 · 12 October 2026
CEO
I commissioned this study because finishing at Tikhaya Versta is over budget again, even though we have a tender; I do not understand why.
Full participant answer
Good afternoon. To get straight to it: a request from construction comes a month and a half to two months ahead, estimating calculates the estimated price, and the tender team collects proposals, usually four to six participants. Then the committee selects on Thursdays; I approve anything more than 5% above the estimate. Then the contract. I commissioned this study because finishing at Tikhaya Versta is over budget again, even though we have a tender; I do not understand why.
Interview 03 · answer 1 · 12 October 2026
Cost engineer
Galina Petrovna or Roman (the project manager) messages “calculate the plastering for the second building, needed it yesterday.”
Full participant answer
The most recent case was plastering and screed for the second building of Tikhaya Versta, March–May. It started the usual way: Galina Petrovna or Roman (the project manager) messages “calculate the plastering for the second building, needed it yesterday.” So I sit down and calculate. I am an estimator, to be clear, in the estimating department; we prepare the bill of quantities and price, then the tender team takes over.
10
Sample. The company is fictional
What the findings are based on
We distinguish participants’ accounts, the analyst’s calculations and the proposed future work so the sample can support a decision on the next stage.
Glossary +
Expected benefit
the effect a change is proposed to achieve; until measured in a pilot, it is a hypothesis.
Calculation basis
a transparent calculation from available estimates. It does not prove future savings.
Four types of information
Type
How to use it
Given context of the training company
The description, structure, systems and official procedure from the open part of the original case. This is a fictional starting situation.
Participants’ accounts
Exact answers from modeled respondents through the product. They reveal discrepancies and provide grounds for checking; they do not replace documents and system events.
Analytical findings and calculations
Comparison of answers, chosen priorities and workload range. Sources, limitations and the calculation method are provided.
Proposals for the future process
The opportunity register, target map and transition plan. Not customer-approved or implemented; quality and benefit have not yet been measured.
Participants’ corrections take precedence over earlier answers
We use 2–4 hours to estimate proposal consolidation: the participant corrected the original 3–4. Finance clarified that the addendum became visible at the КС-2 check rather than at payment. The contractor corrected his slip about “three times” to an estimate of 12–18%. That last figure remains his opinion: there has been no independent engineering recalculation.
The actual state of documents and workflows for the selected procurement; a continuous sequence of all events has not been verified.
Current signatory authority and the application of thresholds to contract changes.
Confirmation of bill versions and the reasons for quantity discrepancies; the contractor’s estimates do not prove an estimator error.
How representative the monthly workload is, the share of repeated consolidation and the actual cost of time.
Data extraction quality on source files, integration methods, and operation and support costs.
What you can assess here as a Selfware buyer
Whether the analysis makes the process clear, whether the grounds for proposals are traceable, whether AI and human tasks are distinguished, and whether you can choose a next step and define how to test it. That is what the sample is for. It shows the content of the first stage; it does not promise proven payback or report a completed implementation.